Module 5:

Making connections

5.2 Not doing an activity

5.2.20 Surface removal

If a pitch is in significant need of surface removal, but the activity is not carried out at renovation time, which one of the following outcomes is most likely?

Surface removal

Where a pitch is in need of surface removal, rather than renovation through a non-surface removal process, pitch and playing quality will deteriorate, often significantly.

Module progress: 42%