5.2 Not doing an activity
5.2.20 Surface removal
If a pitch is in significant need of surface removal, but the activity is not carried out at renovation time, which one of the following outcomes is most likely?
5.2 Not doing an activity
5.2.20 Surface removal
If a pitch is in significant need of surface removal, but the activity is not carried out at renovation time, which one of the following outcomes is most likely?
Where a pitch is in need of surface removal, rather than renovation through a non-surface removal process, pitch and playing quality will deteriorate, often significantly.